Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20080679
Veröffentlichungsdatum: 9 Juni 2009

Projektträger – zwischengeschaltetes Finanzinstitut

Stora Enso Oyj

Ort

Beschreibung

The project comprises two parts. Part I concerns investments in research, development and innovation related to pulp, paper packaging and forest products. Part II includes design, construction and operation of a combined heat and power generation facility in Ostroleka, Poland.

Ziele

The RDI part of the project will support the research activities and technical development within a European paper and forest products manufacturer. The power plant project is located in a convergence region and the project will employ an efficient, combined heat and power technology and help to increase the energy self-suffiency of the promoter.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 230 million.

Gesamtkosten (voraussichtlicher Betrag)

The RDI related project cost is estimated at up to EUR 348 million. in total. The project cost related to the power plant to be is estimated at EUR 137 million. This leads to total project costs of EUR 485 million.

Umweltaspekte

For the RDI part, an EIA will not be necessary according to EIA Directive as long as existing RDI facilities are used. The power plant is part of a bigger investment programme which falls under Annex I of Directive 85/337/EEC and is subject to an EIA. This part will require appropriate environmental permits under IPPC Directive 2008/1/EC. Full environmental details will be assessed during appraisal, including possible impacts on protected flora and fauna.

Auftragsvergabe

The promoter is a private company, not operating in the utilities sector, and is not covered by EU directives on procurement. During the appraisal, the Bank will verify the promoter’s procurement procedures to ensure that the project benefits from market-based competition between potential subcontractors.

Projektstatus

Unterzeichnet - 9/02/2010

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Finnland Polen Schweden Energie Industrie