Referenz:
20080499
Veröffentlichungsdatum: 29 September 2010
Veröffentlichungsdatum: 29 September 2010
Projektträger – zwischengeschaltetes Finanzinstitut
Trafikverket
Ort
Beschreibung
The construction of a double-track railway tunnel with 2 new stations beneath central Stockholm.
Ziele
The tunnel will significantly improve the traffic throughput to and from south of Stockholm.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 0.6 billion.
Gesamtkosten (voraussichtlicher Betrag)
EUR 2.2 billion.
Umweltaspekte
Given that an urban railway project falls under Annex II of the directive 85/337/EC, a competent authority decides on the requirement of an EIA and confirms that the project complies with the requirements of the EU nature conservation policy, according to the EU Birds directive (97/409/EEC) and the Habitat directives (92/43/EEC) and Nature 2000.
Auftragsvergabe
The project is subject to EU public procurement directives (2004/17/EC and 2004/18/EC).
Projektstatus
Unterzeichnet - 9/12/2010