Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20080122
Veröffentlichungsdatum: 22 Juli 2008

Projektträger – zwischengeschaltetes Finanzinstitut

Wessex Water Services Limited.

Ort

Beschreibung

The investment programme concerns the second half of the investments required by Wessex Water under its 2005-2010 Asset Management period (AMP4). It includes schemes for the purpose of capital replacement, the sound management of water resources and security of supply as well as quality and environmental compliance to international standards (including the EU Urban Wastewater Treatment Directive) and national regulations set out by OWFAT (water company regulator), the Drinking Water Inspectorate and the Environment Agency.

Ziele

The proposed programme aims at supporting sustainable environmental and customer service standards set by EU and national legislation as well as stimulating regional development. The project will therefore contribute to improving the quality of life of the population in the South West of England.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to GBP 140 million.

Gesamtkosten (voraussichtlicher Betrag)

Estimated to be some GBP 300 million.

Umweltaspekte

The quality regulators determine the framework for environmental investments for each regulated period and the companies propose on this basis a set of necessary environmental investments. Each environmental investment proposal is then reviewed by an independent consultant appointed by OFWAT before being approved and taken into consideration in the OFWAT’s price setting. The local offices of the quality regulators follow up the implementation and compliance of each environmental scheme.

Auftragsvergabe

Wessex Water fully complies with the requirements of Procurement Directive 93/38/EC of June 1993 and its amendment 2004/17/EC as well as 93/37/EEC of 14 June 1993 for public works contracts, 93/36/EEC of 14 June 1993 for public supply contracts, 92/50/EEC of 18 June 1992 for public service contracts and their amendment Directive 2004/18/EC of 31 March 2004.

Projektstatus

Unterzeichnet - 26/11/2008

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Wasser, Abwasser