    Übersicht

    Veröffentlichungsdatum
    24 April 2025
    Projektstatus
    Referenz
    Unterzeichnet | 10/04/2025
    20240047
    Projekttitel
    Projektträger – Finanzintermediär
    IBERDROLA EXTREMADURA HYDROPOWER UPGRADE
    IBERDROLA SA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 50 million
    EUR 121 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project will fund the upgrade and retrofitting of the existing 313 MW reverse pumped-storage hydropower plant (the Torón-Valdecañas scheme), located in the Extremadura region.

    The aim is to enhance the pumping capacity of the plant to enable the cyclical transfer of water between the two major reservoirs of Alcántara and Valdecañas. This improvement will significantly increase the energy storage capacity of the Tagus River cascade and the whole Spanish grid.

    Zusätzlichkeit und Wirkung

    Through this upgrade pumped-storage hydro project, the European Investment Bank (EIB) will contribute to increasing the energy storage capacity and flexibility of the power system in Spain. The Project aims to support the integration of variable renewables. It will improve system reliability and contribute to security of supply.

     

    The EIB's support addresses market failures related to public goods and climate change externality. This aligns with the EU policy on energy storage, as defined in the Electricity Directive (2019/944), REPowerEU targets, and the updated National Energy and Climate Plan (NECP) of Spain.

     

    The financing of this storage project is a significant contribution to the EIB's lending priority on Energy and its transversal objectives on Climate Action, Environmental Sustainability, and Social and Economic Cohesion, especially since it is located a Less Developed EIB Cohesion Priority region.

     

    The Project is expected to be financially sustainable and deliver positive economic benefits.

     

    The EIB's financing provides an additional source of funding to the Promoter, which is currently one of the major operators in the renewable energy sector in Spain. The Bank's financial contribution is considered very good and valuable to the client, as the EIB's offering is more favourable than market alternatives and the "EIB Green Loan" label is deemed as a stamp of quality on the Promoter's investments.

    Umweltaspekte
    Auftragsvergabe

    The project has very low environmental impact, as the related works are limited to installation equipment within the existing powerhouse buildings or on the designated project land. Considering the location of the Valdecañas plant, the promoter has assessed whether the project significantly impact the Natura 2000 Network, either directly or indirectly. The appropriate assessment has determined that the project is unlikely to have significant effects on Natura 2000 sites, provided that the agreed-upon mitigation measures are implemented. The financing of this programme is in line with the transversal objectives on Climate Action (mitigation), Environmental Sustainability (Pollution Prevention Control). The environmental and social due diligence will focus on the promoter's capacity to comply with the EIB' s environmental and social standards and requirements.

    The promoter shall ensure that the contracts for the project implementation have been tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Phase
    In Prüfung
    Genehmigt
    Unterzeichnet
    8 November 2024
    10 April 2025

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - IBERDROLA EXTREMADURA HYDROPOWER UPGRADE
    Datum der Veröffentlichung
    3 Oct 2025
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    252634149
    Thema
    Umweltinformationen
    Projektnummer
    20240047
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen