Link zum projekt
Datenblätter
Andere Links
Übersicht
Veröffentlichungsdatum
29 September 2010
Projektstatus
Referenz
Unterzeichnet | 09/12/2010
20080499
Projekttitel
Projektträger – Finanzintermediär
Stockholm City banan
Trafikverket
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 0.6 billion.
EUR 2.2 billion.
Beschreibung
Ziele
The construction of a double-track railway tunnel with 2 new stations beneath central Stockholm.
The tunnel will significantly improve the traffic throughput to and from south of Stockholm.
Umweltaspekte
Auftragsvergabe
Given that an urban railway project falls under Annex II of the directive 85/337/EC, a competent authority decides on the requirement of an EIA and confirms that the project complies with the requirements of the EU nature conservation policy, according to the EU Birds directive (97/409/EEC) and the Habitat directives (92/43/EEC) and Nature 2000.
The project is subject to EU public procurement directives (2004/17/EC and 2004/18/EC).
Link zum projekt
Übersicht
Andere Links
Datenblätter
Weitere Veröffentlichungen
Weitere Veröffentlichungen
Zugehörige Pressemitteilungen
Aktuelles und Storys
Link zum projekt
Andere Links