10 August 2005
Projektstatus
Referenz
Unterzeichnet | 25/11/2005
20040462
Projekttitel
Projektträger – Finanzintermediär
Deir Azzour Power Plant
Public Establishment of Electricity for Generation and Transmission (PEEGT)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 200 million
Estimated at EUR 480 million
Beschreibung
Ziele
Construction and operation of a dual-fired Greenfield power generating plant of a base load Combined Cycle Gas Turbine unit of 750 MW.
The project aims at the cost-effective supply of electricity, both to cover the growth of demand and re-establish security of supply. The combined cycle gas turbine technology is expected to raise the average thermal efficiency of the system and thereby to contribute to lowering emissions of greenhouse gases and air polluants per unit of electricity generated.
Umweltaspekte
Auftragsvergabe
Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures applied as necessary.
International procurement, in line with EIB guidelines.