Link zum projekt
Datenblätter
Andere Links
Übersicht
Veröffentlichungsdatum
28 April 2003
Projektstatus
Referenz
Unterzeichnet | 30/09/2004
19990470
Projekttitel
Projektträger – Finanzintermediär
Litoral Centro Motorway
The consortium, BRISAL - Autoestradas do Litoral.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
Up to 50% of the total project cost.
EUR 600m, indicatively.
Beschreibung
Ziele
The project consists of the design, construction and operation, under a 30-year concession, of a new toll motorway (100 km length) between Marinha Grande and Mira (central Portugal).
By delivering high quality road infrastructures, the project will contribute to reduce the traffic congestion at the local level and to improve the road safety and traffic conditions in the west coast of Portugal.
Umweltaspekte
Auftragsvergabe
Compliance with EU environmental directives and national laws shall be ensured.
The project was advertised in the Official Journal of the EU in June 1999, in accordance with Directive 93/37/CEE and the concession was awarded provisionally on 12/03/2003.
Kommentar(e)
Road transport.
Link zum projekt
Übersicht
Andere Links
Datenblätter