Referenz: 20250679
Veröffentlichungsdatum: 22 Dezember 2025

Projektträger – zwischengeschaltetes Finanzinstitut

ZWECKVERBAND BREITBANDVERSORGUNG LANDKREIS LOERRACH

Ort

Beschreibung

The project concerns the rollout of very high capacity networks in the district of Lörrach in Germany. The long-term target is to connect every household with an optical fibre cable for the provision of Gigabit broadband services by 2030. The investments will enable an additional 30 000 homes connected with access to Gigabit fixed line broadband services, mainly in the so called "grey areas", suburban and urban areas with limited alternative broadband services. The project will bring a significant uplift of the broadband service offering as the customers are today often served by less developed broadband services below 30 Mbps.

Ziele

The long-term target is to connect every household with an optical fibre broadband access line by 2030. The current rollout is focused on areas with limited ultra-high speed broadband coverage. The investments will enable thousands of homes with access to gigabit fixed line broadband services. The implementation will take place from 2026 to 2030. The project will bring a significant uplift of the broadband service offering up to gigabit services.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 70 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 140 million

Umweltaspekte

Investments in fixed telecommunications projects (mainly civil works for fibre rollout) do not fall under the Annexes of the Environmental Impact Assessment Directive 2014/52/EU amending Directive 2011/92/EC. The related works typically have limited residual environmental effects as they are mainly carried out alongside existing transport infrastructure such as roads.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation.

Projektstatus

In Prüfung - 28/11/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Deutschland Telekommunikation