The project will support investments in low and medium voltage distribution network (overhead and underground lines and substations). In particular, it concerns the construction of new transmission substations and the upgrade of existing ones.

Ziele

The project aligns with the strategic priorities of EU renewable energy and greenhouse gas emission reduction, as well as competitive and secure energy. It will also contribute to climate action and environmental sustainability objectives, in particular to climate mitigation, since the related investments will facilitate further the integration of renewable energy sources into the Cyprus’ energy mix. Furthermore, the project supports the objectives of the EU cohesion policy in Cyprus, defined an EU “transition” cohesion region).

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 215 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 288 million

Umweltaspekte

The project includes components that may fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected for some schemes relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC).

Auftragsvergabe

The EIB requires that the Promoter ensures that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

In Prüfung - 11/07/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Zypern Energie