Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20230383
    Veröffentlichungsdatum: 21 September 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    FIRSTRAND BANK LTD

    Ort

    Beschreibung

    The facility will provide funding to FirstRand Bank Limited (FRB) to support the development and upscaling of solar photovoltaic and wind renewable energy investments in South Africa, in line with the EIB Climate Action eligibility criteria.

    Ziele

    The aim is to enhance access to finance for independent power producers operating in South Africa to implement low-carbon and climate resilient project, which will lead to a substantial reduction of carbon emissions.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 400 million

    Umweltaspekte

    The operation intends to generate environmental benefits by supporting renewable energy (i.e. solar photovoltaic projects, onshore wind) schemes that help to mitigate climate change. The underlying schemes would fall under the Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU (amending Directive 2011/92/EU), if located within the EU, requiring the competent authorities to determine whether an environmental impact assessment is required. In such case, the Borrower will ensure that an Environmental and Social Impact Assessment is carried out and that public consultation is undertaken in accordance with national legislation and the EIB environmental and social standards. The EIB will assess the capacity and procedures of the Borrower to ensure the underlying schemes' compliance with national environmental, social and biodiversity regulations, as well as with the EIB's environmental and social standards.

    Auftragsvergabe

    The EIB will require the Borrower to ensure that implementation of the underlying schemes will be done in accordance with the EIB's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 8/07/2024

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    6 Februar 2024
    8 Juli 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Südafrika Energie