Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20230123
    Veröffentlichungsdatum: 6 September 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    DEPARTEMENT DE L'EURE

    Ort

    Beschreibung

    Framework loan for financing multi-sector investments as part of the sustainable development programme of the Department of Eure for the period 2024-2028.

    Ziele

    The project supports investment in public buildings, urban development, sustainable mobility and adaptation to climate change. This is expected to contribute to better balanced territorial development, reducing inequalities between people and between places. It will therefore improve living conditions in the department as well as strengthen socio-economic prosperity.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 390 million

    Umweltaspekte

    The Promoter will be required to act according to the provisions of the relevant EU Directives including, but not limited to, SEA (2001/42/EC), EIA (2011/92/EU amended by Directive 2014/52/EU), Habitats (92/43/EEC) and Birds (2009/147/EC) Directives and Water Framework Directive (2000/60/EC) as transposed into national law. The Bank will also assess the Promoter's compliance with the Energy performance of buildings directive (Directive EU/2018/844) at appraisal and during the allocation phase. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and climate adaptation.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    In Prüfung - 3/10/2023

    Milestone
    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Frankreich Kombinierte Infrastrukturvorhaben