    Referenz: 20210696
    Veröffentlichungsdatum: 15 Juni 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    BALTIC POWER SP ZOO

    Ort

    Beschreibung

    Development, construction and operation of a very large-scale (up to 1.2 GW) offshore windfarm in the Polish Economic Exclusive Zone in the Baltic Sea, located 23 km to the north of the Polish coastline. The Promoter is a joint venture of PKN ORLEN (Poland) and Northland Power (Canada).

    Ziele

    The project should foster the integration of mature variable renewable generation technologies in the market. The Bank's financing would thus fill a market gap in the development of new renewable capacity: that would include a financing gap for projects that try to develop new capacity with more market-exposed structures and instruments.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 3112 million (EUR 655 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 16001 million (EUR 3365 million)

    Umweltaspekte

    Wind farms adhere to the national legislation having transposed Annex II of Directive 2014/52/EU amending Directive 2011/92/EU, thereby leaving it to the competent authority to determine if an environmental impact assessment (EIA) is mandated. Given the project size, the competent authority required an EIA to be conducted. Compliance of the authorisation process with relevant EU Directives will be verified during appraisal.

    Auftragsvergabe

    It is provisionally understood that the Promoter, which is a Special Purpose Vehicle (SPV), is neither a contracting authority nor a public undertaking in the sense of the EU procurement policies. It also does not see to operate on the basis of special or exclusive rights granted by a competent authority in relation to this project. Consequently, no public procurement would be required. This needs to be confirmed during appraisal.

    Projektstatus

    Unterzeichnet - 14/09/2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Energie