Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20210487
    Veröffentlichungsdatum: 17 Januar 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    COMPANIA NATIONALA AEROPORTURI BUCURESTI SA

    Ort

    Beschreibung

    The project comprises the delivery of the Bucharest Henri Coanda Airport Capital Investment Plan. It consists of a number of infrastructure enhancements at Bucharest international airport designed to increase operational resilience, ensure that the highest levels of aviation safety and security are preserved and improve airline and passenger experience through infrastructure improvements. Major works include: i) the structural overlay and rehabilitation of one of the airport's two main runways and associated taxiway system; ii) the renovation of the baggage handling screening system; iii) the rehabilitation of aircraft parking stands, and; iv) a range of improvements to the airside area of the airport.

    Ziele

    The project will guarantee that the highest levels of safety, security and efficiency are maintained across the airport infrastructure and address current service level deficiencies, enhancing operational resilience and service standards.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    not disclosed

    Gesamtkosten (voraussichtlicher Betrag)

    not disclosed

    Umweltaspekte

    A number of investment schemes included in this investment loan would be classified under Annex II of the Directive 2014/52/EU amending the EIA Directive 2011/92/EU, meaning that the Competent Authority makes the decision as to whether a formal environmental impact assessment (EIA) is required or not.

    Auftragsvergabe

    The Promoter has been assessed by the EIB as being a public company subject to EU rules on public procurement. The Bank will require the Promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    In Prüfung - 19/07/2021

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Rumänien Verkehr