Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190033
Veröffentlichungsdatum: 10 Mai 2019

Projektträger – zwischengeschaltetes Finanzinstitut

PUBLIC ENTITY(IES)

Ort

Beschreibung

The project consists of an allocation under the Structural Programme Loan (SPL) Romania EU CO-Financing for Environment 2014-20 (2015-0548) aiming to achieve compliance with the EU Drinking Water and Urban Wastewater Treatment Directives in the County of Vrancea.

Ziele

The project is focused on fulfilling the compliance requirements for water and wastewater (Urban Waste Water Treatment Directive 91/271/EEC and the Drinking Water Directive 98/83/EC), of agglomerations with more than 2 000 PE (Population Equivalent) for wastewater collection and treatment, and localities with more than 50 inhabitants for water supply. In this respect, the proposed investments envisage extending the service coverage for drinking water supply and wastewater collection and treatment, as well as addressing the deficiencies of the existing systems.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 20 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 207 million

Umweltaspekte

All the project components were screened according to the Annex II of the Environmental Impact Assessment (EIA) Directive. None of the components required an EIA.

Auftragsvergabe

The Bank will require the promoter (Regional Operating Company) to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.

Projektstatus

Genehmigt - 21/06/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Rumänien Wasser, Abwasser