Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20180198
    Veröffentlichungsdatum: 18 Juli 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    ACCEPTABLE BANK(S)

    Ort

    Beschreibung

    The proposed Sovereign loan will support energy-efficiency projects of industrial enterprises in Uzbekistan

    Ziele

    The project is in line with the EU objectives set out in the EU and Central Asia Strategy for a New Partnership and particularly the EU-Uzbekistan Memorandum of Understanding on cooperation in the field of energy, renewed in February 2017. The funding will support the country's sector reforms, improve EE (Energy Efficiency) and reduce GHG (Greenhouse gas) emissions.

    Kommentar(e)

    The proposed operation is a loan to support Energy Efficiency ("EE") investment in Uzbekistan and it would complement an ongoing World Bank (WB) project ("Uzbekistan EE for Industrial Enterprises (UZEEF)".

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    Not applicable.

    Umweltaspekte

    The Promoter will be required to implement and operate the relevant investments in conformity with national law, World Bank rules and the EIB environmental and social standards as set out in Vol I of the EIB Environmental and Social Handbook. This project intends to bring environmental benefits by supporting Energy Efficiency investments that reduce consumption and thus help to mitigate climate change. Most of the individual investment schemes currently envisaged under this framework loan are small and are expected to have limited environmental and social impacts. The main investment envisaged are variable speed drive installation, waste heat recovery, modernisation of compressor stations and inefficient boilers replacement. However some of the investments may relate to projects falling under Annex II of the EIA Directive 2014/52/EU (amending the 2011/92/EU) if located in the EU, requiring the competent authorities to determine whether an EIA is required. Where a formal EIA is required (or would be required, were the project located in the EU), a copy of the Environmental & Social Impact Study or the Non-Technical Summary (NTS) or equivalent document will be provided to the Bank, and published on its website at the time of allocation. The FI will also be required to verify that none of the schemes submitted for financing by the Bank have a significant negative impact on any site of nature conservation importance. The Promoter's capacity to ensure that the schemes are in compliance with the EIB's environmental and social standards and the principles of relevant EU Directives will be also verified at appraisal. All project's components are expected to be operated and implemented in conformity with applicable national law, World Bank rules and the EIB environmental and social standards.

    Auftragsvergabe

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 5/10/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Usbekistan Durchleitungsdarlehen