Veröffentlichungsdatum: 19 August 2015
Projektträger – zwischengeschaltetes Finanzinstitut
PUBLIC ENTITY(IES)Ort
Beschreibung
The project consists of the design, construction and financing of approximately 27 km of the D4 motorway around Bratislava, which will connect to the R7 expressway (outside the scope of EIB financing) and is to be procured as part of the D4R7 public-private partnership (PPP).
Ziele
The project will provide enhanced transport capacity to the Bratislava region and improved connectivity both locally and strategically. Socio-economic benefits are mainly expected from improved and more reliable journey times. The D4 motorway is located on the trans-European transport network.
Sektor(en)
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 427 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 883 million
Umweltaspekte
The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and passes through known Natura 2000 sites – particularly in the area of a proposed new River Danube crossing along the D4 motorway section. Compliance with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC, Habitats Directive 92/43/EEC and Birds Directives 2009/147/EC will be reviewed at appraisal in addition to any requirement for EIA from a trans-boundary perspective (Espoo Convention).
Auftragsvergabe
The project is being procured as a PPP under the terms of a design-build-finance-operate (DBFO) contract. Procurement started in December 2014 via a competitive dialogue procedure. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/17/EC or 2004/18/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where required.
Projektstatus
Unterzeichnet - 21/06/2016