    Referenz: 20140733
    Veröffentlichungsdatum: 14 April 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    BANK GOSPODARSTWA KRAJOWEGO

    Ort

    Beschreibung

    Framework loan to co-finance a national programme for refurbishment and new construction of rental social housing throughout Poland. The loan will be intermediated through Bank Gospodarstwa Krajowego (BGK), the national development bank, which will on-lend loan proceeds to non-profit social housing enterprises (TBS) or other eligible housing operators implementing the project.

    Ziele

    The framework loan will help meet Poland's national housing needs by providing access to social and affordable housing for low and moderate-income households with a focus on areas not covered by previous national social housing programmes.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 800 million

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 3000 million

    Umweltaspekte

    The project is a multi-scheme operation classified as a framework loan. Some of the schemes may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, or may have an impact on an area forming part of the Natura 2000 network. It is a requirement that all schemes must be implemented in compliance with EU environmental legislation.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 17/12/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Stadtentwicklung