    Referenz: 20140459
    Veröffentlichungsdatum: 23 Februar 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    EMPRESA NACIONAL DE TRANSMISION ELECTRICA

    Ort

    Beschreibung

    The project consists of 480 km of 230 kV east-west transmission lines in Nicaragua, which will connect a large hydro power plant (253 MW power, 40 km2 regulating reservoir) to the main and regional network, including as well five new/extended substations. The present project involves both public and private sectors; the EIB support will go to the public sector investment. The public sector investment concerns the transmission line which is to be implemented by the Nicaraguan government via the state-owned transmission company.

    Ziele

    The project consists of transmission investments that are necessary to allow access of a renewable electricity project to the main consumption centres of the country, to replace present and future fossil-based generation. The project therefore contributes to the mandate objectives of climate change mitigation and economic infrastructure development.

    Sektor(en)

    Garantie im Rahmen des Außenmandats

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    USD 160 million

    Gesamtkosten (voraussichtlicher Betrag)

    USD 448 million

    Umweltaspekte

    Due to its size and technical characteristics, the project, if located within the EU, would fall under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EU, requiring mandatory EIAs for the transmission lines and hydro power plant. Therefore, the environmental and social impact has been evaluated through appropriate environmental and social impact assessment (ESIA) procedures, including public consultation. The ESIA procedures and the issuance of the relevant environmental permits for the hydro power plant and transmission lines have been completed, identifying the relevant environmental and social impact and risks and developing relevant environmental and social management plans (ESMPs) to manage the impact. The EIB will ensure that appropriate measures are taken to protect the environment and the rights of the project-affected people and avoid, reduce, mitigate, compensate and remedy the impact.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project is done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 29/12/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Nicaragua Energie