Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20130464
Veröffentlichungsdatum: 10 Dezember 2014

Projektträger – zwischengeschaltetes Finanzinstitut

The borrower is the People's Republic of China, represented by the Ministry of Finance, who will on-lend to a privately owned project company.

Ort

Beschreibung

The project is an allocation under the China Climate Change Framework Loan II, and consists of the financing of a biomass CHP unit (25 MWe – 45 MWth) in the city of Gushi (Henan province, China). The plant will run on biomass sourced regionally (crop stalks). The electricity will be fed into the national grid and the generated heat will be supplied to a heat/steam network currently under development.

Ziele

The project will generate heat and electricity from locally sourced, sustainable agricultural biomass residue, replacing inefficient and polluting coal-fired boilers in an urban environment (when the project is completed, existing small and inefficient coal steam boilers will be decommissioned), with a mainly positive environmental and social impact.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 30 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 64 million

Umweltaspekte

The project will have a positive impact on the environment by reducing the need for fossil fuels for energy and heating and thus indirectly reducing pollution (mainly airborne pollution including CO2) in an urban environment. An environmental impact assessment (EIA) has been performed for the project. The Bank will review the EIA process and documentation during appraisal and ensure adherence to its environmental and social standards.

Auftragsvergabe

The Bank will require that the implementation of the project will be done in accordance with the Bank's Guide to Procurement. The Bank will monitor the procurement process to ensure compliance with our Guide.

Projektstatus

Genehmigt - 21/10/2015

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

China Energie