Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20130153
    Veröffentlichungsdatum: 24 Juli 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    COMPANHIA PAULISTA DE TRENS METROPOLITANOS (CPTM)

    Ort

    Beschreibung

    The project consists of the acquisition of passenger train-sets to provide regional passenger services in São Paulo's regional lines operated by CPTM (Companhia Paulista de Trens Metropolitanos).

    Ziele

    The project is expected to include priority investments in rolling stock acquisition forming part of the promoter's medium term business plan to increase the performance of São Paulo's commuter railway lines operated by CPTM (Companhia Paulista de Trens Metropolitanos). CPTM currently operates six lines, with a total length of some 260 kilometres. São Paulo's authorities are planning to improve the public transport system by increasing the offer on regional services and expanding the network through the extension of lines 8 and 9 as well as the construction of a new line (line 13) linking São Paulo's Guarulhos International Airport.

    The fleet expansion comprises the acquisition of some 75 train units but the exact scope is to be determined during appraisal.


    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 765 million

    Umweltaspekte

    The project is expected to bring to an overall improvement of environment thanks to the reduction in transport-related emissions. The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's environmental and social standards. All details about these issues will be checked at appraisal stage.


    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 20/10/2014

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Brasilien Verkehr