    Referenz: 20110626
    Veröffentlichungsdatum: 26 November 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    MONTENEGRO

    Ort

    Beschreibung

    Rehabilitation of main and secondary roads and construction of city bypasses

    Ziele

    The project is expected to promote economic growth, facilitate trade, support private sector development and ultimately contribute to economic and social cohesion in the region. The project is therefore eligible under the Mandate of the Pre-Accession countries. It is estimated that some 54 km of roads will be constructed or upgraded and a 2.5km tunnel will be built.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 30 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 66 million

    Umweltaspekte

    The individual components of the project are investments of small and medium size that are likely to have reduced environmental and social impacts. If situated in the EU, these schemes would likely fall under Annex II of EIA Directive 2011/92/EU and therefore be subject to screening. Appropriate screening procedures, also in relation to natural habitats and protected species, as well as land acquisition/resettlement will be put in place in collaboration with the other co-financing potential partners. An appropriate Resettlement Policy Framework will be developed to address potential physical or economic displacement.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that any procurement procedures are done in accordance with the Bank’s Guide to Procurement and the relevant applicable EU public procurement rules.

    Projektstatus

    Unterzeichnet - 27/06/2014

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Montenegro Verkehr