    Referenz: 20110273
    Veröffentlichungsdatum: 2 September 2011

    Projektträger – zwischengeschaltetes Finanzinstitut

    Ministry of Transport of the Czech Republic;
    Managing Authority of the Operational Programme of Transport in the Czech Republic

    Ort

    Beschreibung

    The project concerns the first phase of the reconstruction of the Přerov Railway Node located in the Olomouc Region, forming part of TEN-T Priority Project no. 23, Railway Axis Gdansk-Warsaw-Brno/Bratislava-Vienna. The project includes, among other, the reconstruction of 8.8 km of double track lines including all associated works within the boundaries of the Přerov railway node. Line speed will be increased up to 160 km/h in the station vicinity and 80 km/h along the passenger platforms.

    Ziele

    The main objective of the first project phase is to recondition Přerov railway station according to technical and operational parameters determined for the modernisation of the selected railway networks in the Czech Republic, improving capacity and reliability of the existing infrastructure for passengers and freight traffic.

    Kommentar(e)

    Under Framework Loan

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to CZK 677 million (EUR 28 million)

    Gesamtkosten (voraussichtlicher Betrag)

    CZK 4.225 million (EUR 171 million)

    Umweltaspekte

    The EIA process was executed for the full reconstruction of the Přerov railway node, not just this first phase seeking EIB finance in accordance with the applicable legislation, notably the Habitats Directive 92/43/EEC and the EIA Directive 97/117/EC as amended, transposed in the Czech Republic into Act 100/2001 Coll. on the Environmental Impact Assessment. The competent authority assessed that the project did not require an EIA and issued the EIA negative screening decision in June 2005.

    Potential adverse identified effects will occur mainly during the construction phase, including air & light pollution, noise & vibration. These and other impacts have been assessed as minor and temporary. Mitigation measures have been defined.

    Auftragsvergabe

    EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll.

    The contract notices for the international open tender were published in the Official Journal of the European Communities (OJEC).

    Projektstatus

    In Prüfung - 2/09/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Tschechien Verkehr