Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20110074
    Veröffentlichungsdatum: 10 Juni 2011

    Projektträger – zwischengeschaltetes Finanzinstitut

    BMW AG

    Ort

    Beschreibung

    The project concerns the promoter’s investments for the research and development of a complete system of electric and electronic components for the hybridisation of passenger vehicles’ powertrains as well as for their integration in the promoter’s future fleet of vehicles.

    Ziele

    The project will contribute to increasing the promoter’s knowledge and know-how in the field of innovative hybrid powertrains. It is also expected to bring about positive environmental results in terms of reduction of fuel consumption and CO2 emissions, nitrogen oxides, hydrocarbons and other harmful emissions. Moreover, the project is expected to accelerate the accumulation and diffusion of knowledge within the European automotive industry, and therefore to contribute to increasing the European industry’s innovation capacity.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 325 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 660 million

    Umweltaspekte

    The project concerns investments in R&D that are expected to be carried out in existing facilities already authorised and would therefore not require an EIA under the Directive 85/337/EC, amended by Directives 97/11/EC and 2003/35/EC. The project might also include capital expenditures related to the R&D activities. Whether these investments concern test benches for engines, which fall under Annex II of the EIA Directive, along with any other environmental issues, will be clarified during the project’s appraisal.

    Auftragsvergabe

    Procurement is expected to be in line with EIB guidelines for private sector projects. The Bank’s services will verify details during the project’s due diligence.

    Projektstatus

    Unterzeichnet - 25/07/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Deutschland Industrie