    Referenz: 20100133
    Veröffentlichungsdatum: 22 Juni 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    Public Power Corporation S.A.

    Ort

    Beschreibung

    The Project consists of a combined cycle gas turbine (CCGT) power station with a maximum continuous rating of 832 MWe, to be constructed adjacent to unit no. 4 at the existing power station in central Peloponnesus, Greece.

    Ziele

    The project will install modern gas-fired power generation technology with high electrical generation efficiency and a relatively low environmental impact. The new generating capacity provided will contribute to stabilising the transmission network in the South Western region of Greece, meeting future growth in electricity demand and to replacing existing lignite, heavy fuel oil and gas power stations that are scheduled to be decommissioned.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Under appraisal.

    Gesamtkosten (voraussichtlicher Betrag)

    Under appraisal.

    Umweltaspekte

    Due to its capacity (plant over 300 MWth), the project is subject to Annex 1 of the EIA Directive (85/337/EC and amendments) and is required to undergo a full Environmental Impact Assessment. The promoter has confirmed that an Environmental Impact Assessment has been carried out in December 2008 and that the ministries and competent authorities have formulated a positive opinion on the project. The publication of the decision is expected in the near future.

    Auftragsvergabe

    As a state owned entity, the promoter is a public undertaking in the sense of the Art. 2.1(b) of the Utilities Directive 2004/17/EC. The turnkey EPC tender was announced in the OJEU in April 2008 – publication reference is 2008/S 76-103222 / 18-4-2008.

    Projektstatus

    Unterzeichnet - 14/07/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Griechenland Energie