Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20090746
Veröffentlichungsdatum: 23 Februar 2010

Projektträger – zwischengeschaltetes Finanzinstitut

Landsvirkjun

Ort

Beschreibung

The project consists of the development, construction and operation of a hydroelectric plant with associated reservoir and dam.

Ziele

The objective of the new power unit is to meet increasing demand for electricity in the industrial, residential and commercial sectors.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 70 million.

Gesamtkosten (voraussichtlicher Betrag)

Not applicable

Umweltaspekte

The project, if located in the EU, would fall under Annex I of the EU Directive 85/337/EC as amended and would require a full EIA. An EIA that has included some public consultation has been conducted by the promoter who received an environmental permit already in 2001. During the appraisal the Bank shall verify if the EIA process has been carried out properly and that appropriate mitigation and compensation measures have been put in place.

Auftragsvergabe

The promoter is a public undertaking under the definition given in the EU Procurement Directive 2004/17/EC. Based on the preliminary information available, the promoter will be procuring the project construction contracts in compliance with such Directive including the relevant publications in the OJEU.

Projektstatus

Unterzeichnet - 23/03/2011

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Island Energie