Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090581
    Veröffentlichungsdatum: 10 Dezember 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    Metolong Authority, an implementing agency acting under the Lesotho Ministry of Natural Resources.

    Ort

    Beschreibung

    The project concerns a dam, a water treatment plant, storage tanks and a conveyance system to supply parts of the Lesotho Lowlands including the capital Maseru with additional drinking water. The EIB has been approached to fund the conveyor system only, as the other components including the Metolong Dam itself is fully financed by World Bank, the US Millennium Challenge Corporation, and Arab financial institutions.

    Ziele

    The project will support the Bank’s strategic lending priorities in support of EU policy objectives. Specifically in regions outside the EU this covers: infrastructure development, environmental protection and improvement and support of EU presence.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 200 million

    Umweltaspekte

    A comprehensive environmental and Social Impact Assessment (ESIA) according to international best practice standards, including public consultation, was carried out in 2008. That process resulted in an Environmental and Social Action Plan. The ESIA and the action plans will be reviewed during appraisal.

    Auftragsvergabe

    The Metolong Authority will be responsible for procuring all service, supply and works contracts. For all EIB-funded components, procurement will be based on open international tendering with publication in the EC Official Journal, as applicable. The procurement plan and transparency measures will be subject to a detailed assessment during appraisal.

    Projektstatus

    Unterzeichnet - 12/08/2010

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Lesotho Wasser, Abwasser