Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090559
    Veröffentlichungsdatum: 13 Juli 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    Northumbrian Water Group Plc/ Northumbrian Water Limited

    Ort

    Beschreibung

    The Project involves the co-financing of an investment programme for water and wastewater treatment, to be carried out in North-East and South-East England.

    Ziele

    The investments have been approved by the regulator Ofwat in 2009 as part of the 2010-2015 Asset Management Programme for the Promoter and are required for the purposes of ensuring compliance with relevant EU water, wastewater and environmental directives and enhancing the efficiency and resilience of the Promoter’s water and waste water network assets.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    GBP 150 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Estimated at GBP 350 million.

    Umweltaspekte

    The Promoter complies with the requirements of EU EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC, as well as Article 6 of the Habitats Directive 92/43/EEC. The Promoter carries out Environmental Impact Assessment procedures where required by the competent authorities and mitigating measures are applied as appropriate. The quality and environmental regulators independently monitor compliance with effluent discharge permits and drinking water quality standards.

    Auftragsvergabe

    The Promoter fully complies with the requirements of Procurement Directive 93/38/EC of June 1993 and its amendment 2004/17/EC as well as 93/37/EEC of 14 June 1993 for public works contracts, 93/36/EEC of 14 June 1993 for public supply contracts, 92/50/EEC of 18 June 1992 for public service contracts and their amendment Directive 2004/18/EC of 31 March 2004.

    Projektstatus

    Unterzeichnet - 15/06/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Wasser, Abwasser