Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090497
    Veröffentlichungsdatum: 4 Mai 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    The City of Poznan

    Ort

    Beschreibung

    The project consists of 14 schemes, of which 6 major urban road schemes (reconstruction and extension of inner city roads and inner-city bypass, partly in connection to Euro 2012), 3 tram schemes (including light railway extension) and 5 hospital schemes already included in the Poznań City development Plan 2005-2010. The Project is a consequence of long-term investment plans (fast tram – since the 1970s) of the City and its goal to increase its attractiveness to business (better connection to Airport).

    Ziele

    The selected schemes are part of the City’s Development Plan and are expected to contribute to the development strategy of the City of Poznań, improving accessibility through an increase in the road capacity and the reduction of congestion, improving the quality of life.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to PLN 600 million. (approx. EUR 148.28 million.)

    Gesamtkosten (voraussichtlicher Betrag)

    Estimated at PLN 1 500 million. (EUR 375 million.)

    Umweltaspekte

    Poland, as a member State, has to comply with the relevant EU Directives concerning the environment. The Bank will require compliance with the EIA Directive 85/337/EEC amended by Directives 97/11/EC and 2003/35/EC, for every single scheme included in the project. This aspect will be further checked during appraisal, together with the question of the project falling within a plan or a programme requiring a Strategic Environmental Assessment (SEA) in line with Directive 2001/42/EC. Compliance with the EU Directive on the Energy Performance of Buildings (EU Directive 2002/91/EC) and its recast (approval expected during 2010) will be further examined during appraisal.

    Compliance with the EU Habitats Directive 92/43/EEC and EU Birds Directive 79/409/EEC will be required by the bank.

    Auftragsvergabe

    EU Directives (2004/18/EC and 2004/17/EC) on procurement have been transposed into national Polish legislation. Tenders shall be organised in compliance with EU requirements, with publication of tender notices in the EU Official Journal for projects above thresholds. Application of EU procedures by the Polish authorities for the tender of services, supplies and civil works will be reviewed by the Bank’s services during appraisal.

    Projektstatus

    Unterzeichnet - 30/07/2010

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr Gesundheit