Veröffentlichungsdatum: 4 November 2009
Projektträger – zwischengeschaltetes Finanzinstitut
Federal Republic of GermanyOrt
Beschreibung
The project concerns the widening of a 41 km section of the A8 motorway, part of the TEN-T network, between Ulm and Augsburg, from a 2x2 to 2x3 lane standard.
Ziele
Upgrading of motorway (from four to six lanes) in order to reduce frequent congestion and a high accident frequency rate.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 250 million
Gesamtkosten (voraussichtlicher Betrag)
Currently estimated up to EUR 500 million
Umweltaspekte
The project falls under Annex I of the EIA Directive 85/337/EEC, as amended by Directives 97/11/EC and 2003/35/EC and hence an EIA is mandatory. The findings and recommendations of the EIA will be reviewed during the appraisal.
Auftragsvergabe
The tender was published in the EUOJ on January 29th, 2009 (2009/S 19-026801). The concession will include design, construction, financing, maintenance and operation.
Projektstatus
Unterzeichnet - 31/05/2011