Veröffentlichungsdatum: 15 Juni 2009
Projektträger – zwischengeschaltetes Finanzinstitut
REN Gasodutos SA
REN Atlântico SA
REN Armazenagem SA
Ort
Beschreibung
The project consists of three schemes: the expansion of the LNG-Terminal in Sines, the construction of a compressor station at Carregado and the expansion of the Carriço underground storage.
Ziele
To support the beneficiary’s investment plan which aims at reinforcing and extending the natural gas system throughout Portugal.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 150 million.
Gesamtkosten (voraussichtlicher Betrag)
Estimated at EUR 300 million.
Umweltaspekte
The project schemes (with the exception of the compression station) need environmental assessments as required in the EIA Directive 85/337/EC and amendments of 1997 and 2003. By their technical characteristics all schemes fall under Annex I or II of the directive.
Auftragsvergabe
Investments under the project are subject to the procurement procedures as defined in Directive 2004/17/EC for entities operating in the water, energy, transport and postal services sector.
Projektstatus
Unterzeichnet - 28/07/2009
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).