Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090185
    Veröffentlichungsdatum: 4 Juni 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    Republic of Hungary, acting through the Ministry of Transport, Telecommunication and Energy.

    Ort

    Beschreibung

    Design, build, finance and operation (DBFO) of a new road from Nyíregyháza to Vásárosnamény (46km) on the M3 corridor, connecting Budapest with the Ukrainian border.

    Ziele

    The project is part of the National Action Programme for Growth and Employment (2008-2010), the objective of which is, inter alia, to develop missing infrastructure with a particular focus on Pan-European transport corridors.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to 50% of senior debt, however not higher than 50% of the Project costs.

    Gesamtkosten (voraussichtlicher Betrag)

    To be determined.

    Umweltaspekte

    According to EU directive 85/337/EEC the project falls into the Annex I category and therefore an EIA is mandatory. The project will be required to comply with the relevant national legislation and to be in line with EU environmental policy and acceptable to the EIB. In particular, compliance with Directive 97/11/EC and 2003/35/EC, amending 85/337/EEC, the Habitats Directive 92/43/EEC, the Birds Directive 74/409/EEC and SEA Directive 2001/142/EC will be verified during appraisal.

    Auftragsvergabe

    The contracting authority is a public promoter obliged to comply with the European Directives 2004/17/EC and 2004/18/EC of 31 March 2004 and National Public Procurement legislation. The tender of the project was published in the Official Journal of the European Union on 23 December 2008 under registration number TED 2008/S 249-331922 and the process is currently expected to be completed by October 2009.

    Projektstatus

    Unterzeichnet - 19/12/2012

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ungarn Verkehr