    Referenz: 20090079
    Veröffentlichungsdatum: 10 Juni 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    Autostrade per l’Italia SpA, Italy’s largest toll motorway builder and operator and one of the leading players in the European motorway sector.

    Ort

    Beschreibung

    The project sections run largely parallel to the existing alignment, providing for additional motorway capacity to accommodate high traffic volumes (especially heavy goods vehicles) crossing the numerous Apennines passes in Central Italy. Construction works already started and the full upgrade is expected to be completed by 2013.

    Ziele

    The project aims at improving traffic fluidity and road safety, in line with international standards. The existing motorway currently suffers from significant congestion. The proposed upgrades are expected to result in travel time savings and a reduction in vehicle operating costs. The project is also expected to have some air quality and greenhouse gas benefits by way of relative reduction of vehicle emissions.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 500 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 3 000 million.

    Umweltaspekte

    The project will be required to comply with the relevant national and regional legal framework to be acceptable in environmental terms to EIB and in line with EU environmental policy. In particular, compliance with the following EIA Directives will be discussed and verified during appraisal.

    Auftragsvergabe

    The contracting authority is a public promoter obliged to comply with EU directive 2004/18 and National Public Procurement legislation. The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with this legal framework. Details of procurement procedures will be verified during the appraisal.

    Projektstatus

    Unterzeichnet - 24/09/2009

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).