Veröffentlichungsdatum: 2 Juni 2009
Projektträger – zwischengeschaltetes Finanzinstitut
Dublin Airport Authority plc
Feargal O’ Reilly, Group Head of Financial Reporting
Ort
Beschreibung
The construction and fit out of a new terminal building, a new connecting pier, as well as development of associated utilities, aircraft parking stands and taxiways, and campus roads at Dublin Airport. The new terminal will ultimately have the capacity to handle up to 15 million passengers per annum.
Ziele
Dublin Airport is an international connecting point on the TEN-T, making it eligible for finance under one of EIB's priority lending objectives. The project is part of the masterplan for Dublin Airport and is aimed at reducing passenger and aircraft congestion and accommodating long-term capacity needs.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 300 million.
Gesamtkosten (voraussichtlicher Betrag)
In the region of EUR 600 million.
Umweltaspekte
The project is classified under Annex II of Council Directive 85/337 as amended by Directive 97/11/EC and 2003/35/EC, thus requiring a decision by the competent authority whether or not a formal Environmental Impact Assessment (EIA) is required. A formal EIA process was, in fact, required and was carried out.
The local area plan for the airport, which was adopted by Fingal County Council, was accompanied by a Strategic Environmental Assessment, in the context of which, the EIA was carried out. Planning approval was eventually granted following a period of public consultation.
Auftragsvergabe
With the project over 50% complete, the majority of works, goods and services have been procured. The Promoter follows EC Directives on procurement and so the Bank will review during appraisal what type of procedures were adopted for the main work packages and that they were advertised in the Official Journal consistent with the Directives.
Projektstatus
Unterzeichnet - 10/11/2009
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).