Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20080696
    Veröffentlichungsdatum: 17 April 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    SYTRAL (Syndicat Mixte des Transports pour le Rhône et l’Agglomération Lyonnaise)

    Ort

    Beschreibung

    The project concerns 10 schemes included in the seven-year investment plan of the Promoter (Plan de Mandat 2008-2014) concerning urban public transport in Greater Lyon. The plan is the operational tool for the implementation of the urban mobility plan (Plan des Déplacements Urbains) approved in 1997 and reviewed in 2005. The schemes so far identified for financing concern a metro extension, extensions of the tramway and trolleybus networks, bus renewal and tram upgrades, a depot and a park and ride facility.

    Ziele

    The project aim to increase the attractiveness of public transport services compared to private cars, thus reducing the impact of urban transport on the environment.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 350 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 754 million, subject to further evaluation during appraisal.

    Umweltaspekte

    The project is a composite operation and the requirement of a full EIA will be checked during appraisal for every single scheme. However, some of the major components fall under Annex II of the EIA Directive as they are related to extensions of the metro and the tramway network: accordingly, an EIA is not strictly required but should be screened by the Competent Authority. In this case, an EIA has to be carried out where applicable in order to comply with national legislation concerning environmental issues and the public inquiry process (Enquête préalable à la Déclaration d’Utilité Publique).

    Auftragsvergabe

    The Promoter is subject to and follows EU procurement procedures, including publication in the EU Official Journal. All contracts over the relevant EU Directive thresholds will be put out to international tendering. Under these conditions, the procedures adopted by the Promoter are suitable for the project and acceptable to the Bank.

    Projektstatus

    Unterzeichnet - 19/10/2009

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Frankreich Verkehr