Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20080378
    Veröffentlichungsdatum: 28 Dezember 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    Milano Serravalle – Milano Tangenziali SpA

    Ort

    Beschreibung

    The project aims at implementing safety investments on the Milan motorways system in Northern Italy. Safety upgrading measures will be located on some sections of the Milan west motorway ring-road (A50) and of the Milano-Serravalle motorway (A7) including the connection to the Pavia ring-road.

    Ziele

    Most of the project motorways are heavily trafficked. Therefore, safety enhancements are expected to lead to significant societal benefits. In addition, the proposed investments are upgrading the existing motorways to the safety standards required by the European Directives concerned as transposed in the national legislation.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 200 million

    Umweltaspekte

    Compliance of the project (or sections of it) with EU EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC, and compliance with EU Habitats Directive 92/43/EEC and EU Birds Directive 79/409/EEC will be verified at appraisal. The upgrading investments are not part of a plan or programme as defined in the SEA Directive 2001/42/EC (Valutazione Ambientale Strategica) and consequently the SEA Directive is not applicable.

    Auftragsvergabe

    The project's compliance with applicable EU legislation will be checked, with respect in particular to the publication of tender notices in the EU Official Journal, as and where appropriate. Details of the procurement procedures and strategies will be revised during the appraisal.

    Projektstatus

    Unterzeichnet - 26/07/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Verkehr