Veröffentlichungsdatum: 29 April 2008
Projektträger – zwischengeschaltetes Finanzinstitut
Cimpor Inversiones, S.A.
Ort
Beschreibung
Construction of a clinker line at an existing grinding plant.
Ziele
Reduce costs due to the replacement of clinker bought from third parties, strengthen Turkey’s industrial base, and stimulate economic development.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 50 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 120 million.
Umweltaspekte
The project would fall under Annex II of 97/11 Directive amended by 2003/35, which leaves the determination on the EIA to national legislation. Based on preliminary EIA studies, the Public Authority decided that a full EIA is not required due to the location within an existing industrial zone and atmospheric emissions of new production to be in line with EU standards.
Auftragsvergabe
EU procurement legislation would not apply to this private sector project even if the project were located .in the EU.
Projektstatus
Unterzeichnet - 4/12/2009