Veröffentlichungsdatum: 26 Februar 2008
Projektträger – zwischengeschaltetes Finanzinstitut
JP Elektromreza SrbijeOrt
Beschreibung
Design, supply, construction, and operation of six power substations.
Ziele
The project has the purpose of maintaining and improving the reliability and quality of power supply, reducing technical losses, and lowering operation and maintenance costs. The schemes are geographically dispersed all over Serbia.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 25 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 50 million
Umweltaspekte
The Bank’s services, in co-operation with the European Commission, will take particular care to ensure that proper attention is given to all environmental concerns and appropriate mitigation measures are implemented, in line with the Bank’s relevant guidelines, including issues relating to nature conservation areas.
Auftragsvergabe
The Bank will require the Promoter to ensure that contracts for the implementation of the Project shall be tendered in accordance with the EIB Guidelines and the relevant applicable EU procurement legislation with parallel publication of tender notices in the EU Official Journal.
Projektstatus
Unterzeichnet - 12/06/2009
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).