Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20060462
    Veröffentlichungsdatum: 5 Juli 2007

    Projektträger – zwischengeschaltetes Finanzinstitut

    Metropolitan Municipality of Istanbul

    Ort

    Beschreibung

    The project consists of the construction of a new, 17 km long metro line on the Anatolian side of Istanbul and the extension of another one, 8 km in length, on the European side of the Metropolitan area.

    Ziele

    The project will contribute to alleviate the present and future traffic problems.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Approximately EUR 500 million to 700 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Up to EUR 1550 million.

    Umweltaspekte

    The project forms part of a public transport development plan for Istanbul. Were to be implemented within the EU the project would fall within the scope of Annex II of Directive 85/337/EEC (as amended) and it is therefore for the competent authority to decide whether a formal Environmental Impact Assessment is required. According to Turkish legislation on the environment, a full EIA is not required for this type of project. However, a so-called pre-environmental impact study identifying the main impacts and defining the mitigating measures has to be carried out (to be checked during appraisal).

    Auftragsvergabe

    The Metropolitan Municipality of Istanbul (the awarding authority) follows standard international open tendering procedures in compliance with the Bank's guidelines for procurement.The promoter has informed the Bank that it is their intention to proceed in the similar way for the procurement of contracts related to the construction of the new line. Under these circumstances, the procurement procedures followed by the promoter are suitable for the project and acceptable for the Bank.

    Projektstatus

    Unterzeichnet - 11/04/2008

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Türkei Verkehr