Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20060343
    Veröffentlichungsdatum: 31 Oktober 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    The University of Bristol

    Ort

    Beschreibung

    The proposed project consists of the upgrading of the University of Bristol science teaching and research faculties through new building construction for the Departments of Biological Sciences and Mathematics and the refurbishment of the existing HH Wills Physics Laboratory building.

    The project designs have been integrated in the first phase of a 20 year physical development Masterplan for the University's central campus. The new buildings are to be constructed in the Tyndall avenue area of the University including land obtained from the redevelopment of the adjacent, now-disused Children's Hospital site.

    Ziele

    The project will assist the University, one of the leading Higher Education institutions in the UK, in maintaining and improving both teaching and research functions. It will assist innovation and competitiveness and the role of an internationally-regarded Research and Development institution

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to GBP 60 million.

    Gesamtkosten (voraussichtlicher Betrag)

    GBP 134 million.

    Umweltaspekte

    The University has obtained outline planning approval from the Local Authority (LA) for the Masterplan in its entirety. In addition, the University undertook an environmental assessment study (scoping). All three buildings are being constructed/refurbished on brownfield sites. Given the sizes, location and usage, the LA has determined that an EIA will not be required for the buildings being financed by this project. However, detailed planning approval will be needed when designs are complete.

    Auftragsvergabe

    The University is a self-governing institution and Bristol issues tenders in line with EU tendering rules. A contract notice for the prequalification of contractors was published in the OJEU on March 2, 2006 in accordance with the EU Directive 2004/18/EC for competitive dialogue. It is expected that EU procedures will be followed for all project procurement activities.

    Projektstatus

    Unterzeichnet - 16/05/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Gesundheit