    Referenz: 20060238
    Veröffentlichungsdatum: 24 November 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    Antalya Buyuksehir Belediyesi - Antalya Greater Municipality.

    Ort

    Beschreibung

    The project consists of the construction of an 11 km double-track tramway system with 16 stations including a depot, maintenance shops and yards. The project is designed to satisfy passenger demands estimated by the Transportation Master Plan for the year 2020, which is estimated to be up to 14,200 passengers/hour/direction.

    Ziele

    Transport throughout the municipality of Antalya is currently road-based, comprising public buses, minibuses, taxis and private cars. By developing a rail-based system, the municipality aims to improve the quality and enhance the attractiveness of its public transport services. The main economic benefits of the project are expected to be lower levels of road accidents, travel-time savings, reduction in fuel consumption and vehicle usage costs, and reduction in pollution.

    Kommentar(e)

    Urban Transport.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 60 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 122 million.

    Umweltaspekte

    The Bank’s Environmental Statement 2004 states that “The EIB ensures that all projects it finances […] comply with the EU’s Directive on Environmental Assessment.” Within the EU, the project would be considered to fall within the scope of Annex II of Directive 85/337/EEC (as amended) and it would therefore be for the competent authority to decide whether an EIA was required. During the appraisal, the Bank will therefore investigate the screening process applied to this project and, if an EIA is required, will ensure that environmental studies and public consultation for the project comply with EU Directives.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement.

    Projektstatus

    Unterzeichnet - 18/07/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Türkei Verkehr