Veröffentlichungsdatum: 15 Mai 2006
Projektträger – zwischengeschaltetes Finanzinstitut
Network Rail Infrastructure Limited
40 Melton Street
London NW1 2EE
Contact - Mr. T. Winter, Head of Treasury Operations
Ort
Beschreibung
Infrastructure investments to provide capacity enhancement, operational improvements and to ensure continued safety across the rail network. Core elements include investment in the Trent Valley section of the West Coast Main Line, remodelling of Rugby and Nuneaton stations, and power supply upgrades in South London, Wessex, Sussex and Kent.
Ziele
Improved capacity to meet growing demand for rail transport, particularly four-tracking of sections of the Trent Valley route to remove a major bottleneck and facilitating the introduction of new rolling stock in the South East through power supply upgrading. Improved operational efficiency and safety, particularly from infrastructure replacement and remodelling, and signalling development and replacement.
Kommentar(e)
Railway infrastructure.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to GBP 300 million
Gesamtkosten (voraussichtlicher Betrag)
Approximately GBP 1 200 million
Umweltaspekte
NRIL follows a corporate environmental policy which includes applicable national and EU legislation. The procedures will be verified during appraisal.
Auftragsvergabe
NRIL is subject to EU procurement Directives. The application of the directives will be verified during appraisal.
Projektstatus
Unterzeichnet - 9/11/2006
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).