Veröffentlichungsdatum: 1 Februar 2007
Projektträger – zwischengeschaltetes Finanzinstitut
Construction and operation of the project has been awarded by the State of Israel to a consortium of IDE Technologies Ltd. and Housing and Construction Holding Co. Ltd.Ort
Beschreibung
Construction of a reverse osmosis seawater desalination plant with a production capacity of 100 million m3/year in through a BOT contract.
Ziele
Increase in Israel's supply of drinking water.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 125 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 269 million.
Umweltaspekte
EU legislation is not applicable to the State of Israel. If it was, the project would fall under Annex I of EIA directive 97/11/EC requiring a full EIA. An EIA has been prepared for the project under Israeli law and complies with the standards of EU legislation.
Auftragsvergabe
The project has been competitively tendered through an open, international tender procedure.
Projektstatus
Unterzeichnet - 11/11/2007
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).