Referenz:
20040462
Veröffentlichungsdatum: 10 August 2005
Veröffentlichungsdatum: 10 August 2005
Projektträger – zwischengeschaltetes Finanzinstitut
Public Establishment of Electricity for Generation and Transmission (PEEGT)Ort
Beschreibung
Construction and operation of a dual-fired Greenfield power generating plant of a base load Combined Cycle Gas Turbine unit of 750 MW.
Ziele
The project aims at the cost-effective supply of electricity, both to cover the growth of demand and re-establish security of supply. The combined cycle gas turbine technology is expected to raise the average thermal efficiency of the system and thereby to contribute to lowering emissions of greenhouse gases and air polluants per unit of electricity generated.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 200 million
Gesamtkosten (voraussichtlicher Betrag)
Estimated at EUR 480 million
Umweltaspekte
Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures applied as necessary.
Auftragsvergabe
International procurement, in line with EIB guidelines.
Projektstatus
Unterzeichnet - 25/11/2005