    Referenz: 20030134
    Veröffentlichungsdatum: 8 September 2003

    Projektträger – zwischengeschaltetes Finanzinstitut

    Edison S.p.A.

    Ort

    Beschreibung

    Design, engineering, procurement, construction, commissioning and operation of two natural gas-fired combined cycle (CCGT) plants: 

    • The first power plant of about 760 MWe will be located within the municipality of Altomonte in the Calabria region. Electricity will be exported into the Italian grid via a new 2-km connection to the HV-line. Natural gas supply will be via a new 1.3 km gas pipeline.
    • The second power plant will be situated in the municipality of Candela in the Puglia region. The plant's CCGT is designed for a nominal power output of around 380 MWe. Electricity will be supplied through a new 380-kV HV transmission line of 40 km. The fuel will be a mixture of gases, originating from the national natural gas grid and from two local gas sources close to the site.

    Ziele

    The project aims at modernising and increasing the promoter's electricity generating capacity in Italy, with the construction of two new state-of-the-art power plants complying with the strictest environmental standards.

    The project will improve the efficiency of electricity production through the use of efficient combined cycle technology. The addition of cost-effective generation capacity is particularly important in the context of the ongoing market liberalisation in Italy, relatively high electricity tariffs and import requirements of 15% of Italian demand. The project may also reduce atmospheric emissions through the shutdown elsewhere in the country of obsolete polluting units and their replacement with CCGT.

    Kommentar(e)

    Electricity generation

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Of the order of EUR 250 million

    Gesamtkosten (voraussichtlicher Betrag)

    Of the order of EUR 550 million

    Umweltaspekte

    The Environmental permits for both power plants were granted by the Ministry of Environment in 2002, based on Environmental Impact Assessments (EIA) carried out according to national regulations and the relevant EU Directive 97/11/EC, according to which both plants fall under Annex I. The emission limits defined in both environmental permits are in line with EU Directive 2001/80/EC, thanks to the relatively low level of pollution deriving from this modern combined cycle technology and the use of natural gas.

    Auftragsvergabe

    The services and the equipment for both plants have been procured jointly in a number of packages during 2001-2002, following the requirements of the relevant EU directive (93/38/EC, 92/50/EC), including publication in the OJ of the EC.

    Projektstatus

    Unterzeichnet - 29/07/2004

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Energie