Veröffentlichungsdatum: 30 März 2005
Projektträger – zwischengeschaltetes Finanzinstitut
A special purpose company.Ort
Beschreibung
The project involves the design, construction and operation of 83km of new motorway under a long-term, real toll concession. The project will also include the operation of a further 47km of existing non-toll motorway.
Ziele
By delivering high quality road infrastructures, the project will contribute to the reduction of traffic congestion at the local level and improve road safety and traffic conditions in the greater Porto area.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to 50% of total project cost.
Gesamtkosten (voraussichtlicher Betrag)
Indicatively estimated at EUR 600m.
Umweltaspekte
Compliance with EU environmental directives and national laws to be ensured.
Auftragsvergabe
The project has been advertised in the Official Journal of the EU in accordance with EC Directive 93/37/CEE.
Projektstatus
Unterzeichnet - 11/01/2008
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).