    Referenz: 20020489
    Veröffentlichungsdatum: 15 September 2003

    Projektträger – zwischengeschaltetes Finanzinstitut

    Société Tunisienne de l’Électricité et du Gaz (STEG)

    Ort

    Beschreibung

    The planned investment focuses mainly on: i) exploiting the LPG associated with gas production in fields in the south of the country (upgrading of the Gabès LPG plant, construction of a compressor station in Gabès); ii) increasing the capacity, flexibility and security of the gas transmission network ( rehabilitation of the El Borma-Gabès gas line, construction of feeder and grid gas lines); iii) extending public gas distribution in the areas covered by the main gas transmission network; and (iv) upgrading metering stations and installing a SCADA system for the gas transmission and distribution networks.

    Ziele

    The project forms part of the Tenth National Plan (2002-2006). It is included in the Tunisian Government’s priority programme to rehabilitate and upgrade its gas supply, transmission and distribution network, and to improve its safety and management. By contributing to the development of energy supply in Tunisia, particularly in the private sector, the project accords with the goals set under the Bank's FEMIP facility.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 55 million from the Bank's own resources under the EUROMED II Mandate (2002-2007).

    Gesamtkosten (voraussichtlicher Betrag)

    Approximately EUR 115 million

    Umweltaspekte

    An evaluation of the project's environmental impact is required by Tunisian law (Decree 91-362), largely inspired by European Directive 97/11/EEC). Environmental impact studies, mitigating measures and their approval by the National Environment Agency (ANPE) are to be submitted to the Bank.

    Auftragsvergabe

    The contracts for the project's various components will be put out to international tender with publication in the OJEC.

    Projektstatus

    Unterzeichnet - 10/11/2003

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Tunesien Energie