Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20020282
    Veröffentlichungsdatum: 2 September 2003

    Projektträger – zwischengeschaltetes Finanzinstitut

    Railway Procurement Agency
    Contact - Mr. Declan Wylde - Financial Controller

    Ort

    Beschreibung

    Construction of LUAS lines A/C (Tallaght – Abbey St. – Connolly Station) and B (Sandyford – St. Stephens Green).

    Ziele

    LUAS is the first step in developing an integrated light rail and metro network to serve the Greater Dublin Area within the Platform for Change' programme. Public transport in the expanding Greater Dublin Area is primarily provided by buses. Extensive private car use means that the centre is congested for much of the day. The project aims to provide attractive, rapid, high capacity urban public transport on two key corridors, forming the basis for the development of an urban public transport rail network. The LUAS lines under construction may be subsequently extended.

    Benefits will accrue to existing public transport users and private vehicle users as a result of reduced congestion, reductions in pollution and reduced accidents. There are also likely to be wider, but less readily quantifiable, benefits to the urban environment.

    Kommentar(e)

    Urban public transport

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Loan of up to EUR 150 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Current authorized project budget is EUR 691 million for LUAS lines A/C and B.

    Umweltaspekte

    The project falls under Annex II of Directive 97/11/EC, under which the national authorities decide the need for an Environmental Impact Assessment on a case-by-case basis. In order to comply with the procedures required in Annex III of the Directive, the corresponding Environmental Authority is required to issue a statement justifying the decision to waive carrying out a full EIA process. Notwithstanding, due to the urban nature of the area, environmental impacts are likely to be limited. Overall it is expected that the Project will contribute to the LUAS system’s strong positive impact on transport conditions and on the quality of the urban environment.

    Auftragsvergabe

    The promoter follows the EU rules related to public contracts procurement according to the Directive 93/38/EEC and thus contracts for the implementation of the Project have been or will be tendered in accordance with these regulations.

    Projektstatus

    Unterzeichnet - 26/09/2003

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Irland Verkehr