Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20020277
Veröffentlichungsdatum: 17 Juli 2002

Projektträger – zwischengeschaltetes Finanzinstitut

Northumbrian Water Limited Northumbria HouseAbbey Road, Pity MeDurham DH1 5FJUKContact Point: David Martin

Ort

Beschreibung

The project comprises numerous water supply and wastewater treatment schemes located throughout the Promoter's operating area. Northumbrian Water's capex programme for the 2000-2005 period has been approved by the industry regulator, OFWAT, and implementation is closely monitored by the Regulator, the Environmental Agency and the Drinking Water Inspectorate. A large proportion of the schemes is located in Regional Development Areas.

Ziele

The project aims at ensuring Northumbrian Water's compliance with the revised EU Drinking Water Directive and the Urban Waste Water Treatment Directive. All of the schemes included within the project focus on quality improvements and attainment of increasingly stringent environmental standards required by EU and national legislation.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to GBP 100 mio

Gesamtkosten (voraussichtlicher Betrag)

Estimated to be about GBP 440m for the period 2000-2005.

Umweltaspekte

The investments included within the project will serve to improve compliance with the EU Drinking Water Directive (98/83/EC), and to meet the 2005 deadlines of the Urban Waste Water Treatment Directive (91/271/EEC). The project will also help to meet national river quality objective (RQO) improvement targets set by the UK Environmental Agency, which are in-line with the objectives of the EU Water Framework Directive.

Auftragsvergabe

The programme falls under the Procurement Directive 93/38/EC and its amendment 98/4/EC. The promoter has confirmed to fully comply with its requirements.

Projektstatus

Unterzeichnet - 23/10/2002

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Wasser, Abwasser