Veröffentlichungsdatum: 8 April 2002
Projektträger – zwischengeschaltetes Finanzinstitut
Comunidad Autónoma de NavarraOrt
Beschreibung
Construction of a shadow toll road between Pamplona and Logroño.
Ziele
The project will reduce the traffic congestion at regional level and improve road safety and traffic conditions for transit traffic of the whole area connecting the cities of Pamplona and Logroño.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Approximately EUR 150 m
Gesamtkosten (voraussichtlicher Betrag)
Estimated cost of EUR 300 m
Umweltaspekte
The promoter is required to respect the regulations imposed by the Directive 97/11/EC. An Environmental Impact Assessment has been realised. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been taken as regards environmental protection; in particular special measures for impact mitigation have been clearly identified during the design process.
Auftragsvergabe
The project was advertised in the Official Journal of the EU on 15th March 2002 in accordance with Directive 93/37/CEE. It is expected that the concession contract will be awarded before summer 2002.
Projektstatus
Unterzeichnet - 17/10/2002