Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20010547
    Veröffentlichungsdatum: 13 März 2002

    Projektträger – zwischengeschaltetes Finanzinstitut

    Vienna's public housing vehicle on the basis of Provincial law, Wiener Wohnen

    Ort

    Beschreibung

    The City of Vienna has adopted a strategic planning strategy with individual local plans lending detailed physical elaboration to policies covering public transport, road and rail networks, new commerce and quality affordable housing to address the problems of urban drift and decentralisation. The upgrading of decaying neighbourhoods and associated dwellings is therefore part of an integrated overall strategy of urban renewal.

    Ziele

    The schemes, to be selected from eligible components of the promoter's five-year rehabilitation programme, are expected to make a positive contribution towards social, economic and environmental conditions and reduce the impact of social segregation stemming from below-standard public housing. The project covers the first phase of a continuous investment programme within the context of comprehensive long-term rehabilitation.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    About EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    About EUR 200 million

    Umweltaspekte

    As the project consists principally of the upgrading of existing housing stock and public space, there is a priori no need to undertake an Environmental Impact Assessment (EIA) as defined under European Directive 97/11 Annex II. Along with significant improvements in basic sanitation, the dwellings will benefit from improved thermal insulation, to substantially reduce energy consumption. Local neighbourhoods will also benefit from environmental improvements, such as traffic calming measures and landscaping, as part of urban renewal works.

    Auftragsvergabe

    European Directives will be applied.

    Projektstatus

    Unterzeichnet - 26/04/2002

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Österreich Stadtentwicklung